Underground 150kV connection Oirschot


Where others stop, we continue!
The high-voltage pylons between Tilburg Noord and Best will be replaced by an underground connection. Our Big Wheel supplies all cranes, water pumps and generators every day over a distance of 32 km of difficult terrain.

The Big Wheel, which is fully radio-controlled, is even more usable than one of our 4×4 tankers on this very marshy ground. The buffer trailer of 25,000 litres in the field is the own loading depot for the Big Wheel, so that with this configuration all machines have a full tank on time, quickly and efficiently. The flow of work, no machine downtime and safety are thus guaranteed. The construction of the new underground electricity network will take until the end of 2022.