Building Scheldetunnel in Antwerp

FullTank is also actively involved in the construction of the new Scheldt Tunnel in Antwerp. The Scheldt Tunnel is the most spectacular part of the Oosterweel connection. The tunnel will close the Antwerp Ring on the north side and has a total length of 1,800 meters, with eight tunnel elements being built and placed using the ‘immersed tunnel’ method. On the banks of the Scheldt, where preparatory work is in full swing, our driver Yoeri can be found daily on behalf of TM COTU. Yoeri ensures that all the equipment used for the realization of this special project is provided with diesel and AdBlue®. FullTank ensures a full tank at all times and continuity in the work.